Skip to content
Andrew Voirol
WorkLogAboutContact
HomeWorkLog

AboutContact

✦ Just one prompt away from figuring it all out.

Saturday, August 1, 2026google-io-countdown-11-days

One night, two commits, shipped

AI StudioShipping

First user message at 22:40, last at 00:05, two git commits, live on GitHub. The whole arc — AI Studio export to gallery-ready repo — in 90 minutes on a weeknight. No prior git history. No CI pipeline. Just init, stage, commit, create-repo, push.

The demo GIF was the wrinkle. MCP screencast hit workspace root restrictions, so it fell back to ffmpeg -f avfoundation to capture the screen, trimmed the frames, assembled a 4.3MB GIF at 720px wide and 10fps showing the code waterfall scrolling and the plasma aura breathing. The README leads with the GIF, then the static screenshot, then a four-command quick start. Before: 309 packages, Times New Roman, dead timer. After: 157 packages, Playfair Display, frozen at Day 11, spring-physics cursor trail, staggered entrance, breathing plasma, serif feet on the pillars. Apache 2.0. Done.

← Previous

The gap between the ones

Next →

210 lines of SVG wearing a Next.js costume


Andrew Voirol

Builder, hacker, shipper. Currently leaving localhost.

Navigate

WorkBuilder’s LogAboutContactRSS Feed

Connect

X / TwitterGitHubLinkedIn

© 2026 Andrew Voirol·Back to top ↑
✦Just one prompt away from figuring it all out.